![]() ![]() ![]() Officials with the fire department first considered a mini-pumper style apparatus in the mid-1980s when Former Chief Grant Christian led an effort to determine if the design was feasible and cost-effective for the district. The vehicle can also operate as an off-road wild lands firefighting vehicle to supplement our current wild lands fire apparatus while also providing both on and off-road rescue capabilities.” ![]() “It carries the same equipment and pumping capacity as our larger, more-conventional engines. “The design allows the apparatus to bring advanced firefighter capabilities to many rural, off-road locations that bigger, conventional engines are unable to access because of the rural, narrow, steep, twisting driveways found in our district,” officials with the department said. The fire department took ownership of a new apparatus, designated “73 Engine 3,” on June 15. It is the only truck of this design in Stokes and Surry counties, according to the department. The Westfield Volunteer Fire Department recently got its first “mini-pumper” truck, which will beef up firefighting capabilities in the more rural areas of its coverage area. Westfield fire department gets area’s fire mini-pumper The estimated completion time for this project is nine months at a cost of $2.6 million, according to the church. The congregation also was invited to take a spot alongside a rope, which was attached to a plow and assist in pulling the plow to turn the dirt and break ground for the construction site. Tate’ Randy Stanley president of Garanco Inc., the general contractor overseeing the project Eric Riggs, chairman of long range planning Arnold Key, chairman of trustees Jeff Nixon, chairman of deacons Mike Beasley, chairman of finance, and and Danny Sawyers, chairman of building and grounds. The center will feature a high school-sized gymnasium, commercial-grade kitchen, ten classrooms, a walking track, built-in stage, and elevator access to the second level and also the second floor of the existing Educational Building.Īfter a few remarks by Pastor Darrell Tate and a prayer, the following seven people turned the first shovelfuls of dirt: worship service for a ground-breaking ceremony marking the start of work on a 21,000-square-foot Family Life Center. The church’s pastor, the president of the construction company slated to do the work, and the congregation of Highland Park Baptist Church joined together on the lawn of the church following the June 30 11 a.m. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |